Daily News Analysis

KEN- BETWA RIVER LINKAGE

stylish_lining

KEN- BETWA RIVER LINKAGE

Why in the News?

The Ken-Betwa Link Project (KBLP) involving cost of Rs 44,605-crore has finally secured the final forest clearance after 6 years of getting the provisional nod.

Ken-Betwa Link Project (KBLP):

 

 

  1. It is the first project under the National Perspective Plan for interlinking of rivers. 
  2. The project intends to transfer water from the Ken River to the Betwa river, both tributaries of river Yamuna.
  3. The project will be implemented in 2 phases:
    1. Phase-I: Daudhan dam complex and its appurtenances like Low Level Tunnel, High Level Tunnel, Ken-Betwa link canal and Power houses will be completed.
    2. Phase-II: 3 components that includes Lower Orr dam, Bina complex project and Kotha barrage will be constructed.
  4. The project will provide,
    1. Annual irrigation of 10.62 lakh hectares
    2. Drinking water supply to about 62 lakh people 
    3. Generate 103 MW of hydropower.
  5. The drought-prone region of Bundelkhand will get benefitted as the project spreads across 13 districts of Uttar Pradesh and Madhya Pradesh.
  6. Concern:
    1. The Daudhan dam of Ken Betwa Link Project shall cause submergence of 6,017 ha of forest area.
    2. 4,206 ha of area of the project lies within the core tiger habitat of Panna Tiger Reserve.

Recent developments on interlinking of rivers in India:

  1. Dr K L Rao, the then Union Irrigation Minister suggested construction of a National Water Grid for transferring water from water-rich areas to water-deficit areas in 1970s.
  2. Later, a Garland Canal to redistribute water from one area to another was proposed.
  3. The govt dropped both the plans, to take up National Perspective Plan (NNP) for inter basin water transfer in the country. It comprised two components: 
    1. Himalayan Rivers Development
    2. Peninsular Rivers Development
  4. Based on the NPP, the National Water Development Agency (NWDA) identified 30 river links for water resource development:
    1. 16 under Peninsular component 
    2. 14 under Himalayan Component
  5. Generally, 4-5 types of clearances are required for the interlinking of river projects and they include:
    1. Techno-economic (given by the Central Water Commission)
    2. Forest Clearance and Environmental clearance (Ministry of Environment & Forests)
    3. Resettlement and Rehabilitation (R&R) Plan of Tribal Population (Ministry of Tribal Affairs)
    4. Wildlife clearance (Central Empowered Committee)
  6. The interlinking of rivers programme is based on the principle of consensus and agreement among the concerned States.

 

S.No

Name

Rivers

States concerned

 

Peninsular Component

 

 

 

1(a)

Mahanadi (Manibhadra)–

Godavari (Dowlaiswaram) link

Mahanadi and Godavari

Jharkhand, Madhya Pradesh, Chhattisgarh, Telangana,

Andhra Pradesh, Odisha, Karnataka and Maharashtra

 

1(b)

Mahanadi (Bermul)–

Godavari (Dowlaiswaram) link

Mahanadi and Godavari

do

 

2

Godavari(Inchampall)-Krishna(Pulichintala)

link

Godavari and Krishna

Odisha, Madhya Pradesh, Chhattisgarh, Telangana, Andhra Pradesh, Maharashtra

and Karnataka

 

3

Godavari(Inchampalli)-Krishna (Nagarjunasagar) link

Godavari and Krishna

--do--

 
 

4

Godavari(Polavaram)-Krishna(Vijayawada) link

Godavari and Krishna

--do--

 

5

Krishna(Almatti)

–Pennar link

Krishna and Pennar

Telangana, Andhra Pradesh,Maharashtra and Karnataka

 

6

Krishna (Srisailam)–Pennar link

Krishna and Pennar

--do--

 

7

Krishna(Nagarjunasagar)-Pennar (Somasila) link

Krishna and Pennar

--do--

 
 

8

Pennar (Somasila)–Cauvery(Grand Anicut) link

Pennar and Cauvery

Andhra Pradesh, Karnataka, Tamil Nadu, Kerala and Puducherry

 
 

9

Cauvery (Kattalai)–Vaigai–Gundar link

Cauvery, Vaigai and

Gundar

Karnataka, Tamil Nadu, Kerala and Puducherry

 

10

Ken–Betwa link

Ken and Betwa

Uttar Pradesh and Madhya Pradesh

 

11

(i)

Parbati – Kalisindh –Chambal link

Parbati, Kalisindhand Chambal

Madhya Pradesh,Uttar Pradesh and Rajasthan requested to be Consulted during consensus building)

 

(ii)

Parbati-Kuno-Sindh link

Parbati, Kuno and Sindh

Madhya Pradesh and Rajasthan

 

12

Par-Tapi-Narmada link

Par, Tapi and Narmada

Maharashtra and Gujarat

 

13

Damanganga – Pinjal link

Damanganga and Pinjal

--do--

 

14

Bedti-Varada link

Bedti and Varada

Maharashtra, Andhra Pradesh and Karnataka

 

15

Netravati – Hemavati link

Netravati

and Hemavati

Karnataka, Tamil Nadu and Kerala

 

16

Pamba - Achankovil –Vaippar link

Pamba,Achankovil and Vaippar

Kerala and Tamil Nadu

 

 

Himalayan Component

 

1.

Manas-Sankosh-Tista-Ganga(M-S-T-G)link

Manas,Sankosh,

Tista and Ganga

BHUTAN&INDIA

(Assam,West Bengal and Bihar)

2.

Kosi-Ghaghra link

Kosi and Ghaghra

NEPAL&INDIA

(Bihar and Uttar Pradesh)

3.

Gandak-Ganga link

Gandak and Ganga

 

4.

Ghaghra-Yamuna link

Ghaghra and Yamuna

 

5.

Sarda-Yamuna link

Sarda and Yamuna

NEPAL&INDIA

(Bihar, Uttar Pradesh, Uttarakhand, Haryana

And Rajasthan)

6.

Yamuna-Rajasthan link

Yamuna and Sukri

Gujarat, Rajasthan, Haryana and UttarPradesh

7.

Rajasthan-Sabarmati link

Sabarmati

 

8.

Chunar-Sone Barrage link

Ganga and Sone

Bihar and Uttar Pradesh

9.

Sone Dam – Southern Tributaries of Ganga link

Sone and Badua

Bihar and Jharkhand

10.

Ganga (Farakka)-Damodar-

Subernarekha link

Ganga, Damodar and Subernarekha

West Bengal,Odisha and Jharkhand

11.

Subernarekha-Mahanadi link

Subernarekha and Mahanadi

West Bengal and Odisha

12.

Kosi-Mechi Link

Kosi and Mechi

NEPAL & INDIA

(Bihar and West Bengal)

13.

Ganga (Farakka)-Sunderbans link

Ganga and Ichhamati

West Bengal

14.

Jogighopa-Tista-Farakkalink(Alternative to M-S-T-G)

Manas,Tista and Ganga

Assam, Bihar andWest Bengal

         

 

UN Environment Assembly (UNEA)

The seventh session of the United Nations Environment Assembly (UNEA-7) is currently taking place in Nairobi, Kenya. The session focuses on strengthening global cooperation to address pressing env
Share It

23rd India–Russia Annual Summit

1. Strengthening of the Strategic Partnership India and Russia reaffirmed their Special and Privileged Strategic Partnership on the occasion of the 25th anniversary of the 2000 Strategic Partne
Share It

Biological Weapons Convention (BWC)

At the 50-year commemoration of the Biological Weapons Convention (BWC) held in New Delhi, India’s External Affairs Minister highlighted that the world remains ill-prepared to deal with biot
Share It

Judicial Pendency

The Union Minister of Law and Justice has highlighted a serious manpower crisis in the Indian judiciary, where high judicial vacancies combined with a rising case load—nearly 4.80 crore pend
Share It

India’s Electoral Integrity

India’s electoral integrity is increasingly under strain, not because of an absence of reforms, but due to the introduction of potentially deformative measures such as Delimitation, One Nati
Share It

Bioremediation in India

India is increasingly revisiting bioremediation as pollution from sewage, industrial waste, pesticides, plastics, and oil spills continues to degrade the country’s soil, water, and air. Conv
Share It

Police Reforms in India

At the 60th All India Conference of Director Generals/Inspector Generals of Police in Raipur, held under the theme ‘Viksit Bharat: Security Dimensions’, the Prime Minister emphasized t
Share It

Assam Accord

The Supreme Court has recently asked the Union Government to clarify whether a new executive order allowing the entry of persecuted minorities into India violates the 1971 cut-off date prescribed
Share It

Supreme Court Directions on Digital Arrest Scams

A Bench of the Supreme Court, led by Chief Justice Surya Kant and Justice Joymalya Bagchi, issued a landmark directive aimed at strengthening India’s response to cybercrime. Grant of Pan-In
Share It

World AIDS Day 2025

The Ministry of Health and Family Welfare observed World AIDS Day 2025 under the theme: “Overcoming disruption, transforming the AIDS response.” The event highlighted India’s p
Share It

Newsletter Subscription


ACQ IAS
ACQ IAS